![]() Reconstruction of the lock walls, gate ram trench and areas of the lock side. Upgrading and standardising the hydraulic control system. Sandford Lock, Shiplake Lock, Marsh Lock, Hambleden Lock, Bray Lock and Boveney Lock Investment programme October 2023 to March 2024. To receive this information, sign up to the email update service. Revised issues of the programme of works are published throughout the winter, so river users can keep up to date. This programme of work is subject to change, due to weather and other circumstances. This is so that river users can plan their winter cruising and boat movements well in advance. The first issue of the programme is published in August each year. This results in the closure of a number of locks sometimes for relatively long periods. The Environment Agency carries out a programme of works on the River Thames every year between October and the end of March. Planned lock closures: updated 18 August 2023 All boats to navigation on the Buckinghamshire, right side of Temple Island. Upper Thames Autumn Head 2023: the navigation channel will be in the centre of the river. Royal Canoe Club Paddling Challenge 2023: the navigation channel will be on the Surrey, left side of the river.īurway Rowing Club Small Boats Head 2023: the navigation channel will be on the Middlesex, right side of the river. Weybridge Silver Sculls 2023: the navigation channel will be on the Middlesex, right side of the river, using the old river around Desborough Island. Royal Outrigger Canoe Club Hampton Court Challenge 2023: boaters to navigate slowly and keep a lookout between Trowlock Island and Hampton Court Bridge. Sunday 8 October 2023 10am to 12:15pm and 1pm to 3pm Reading Small Boats Head 2023: during racing times all normal river traffic should navigate on the non-towpath, right hand bank. Wraysbury Skiff and Punting Club Regatta 2023: the navigation channel will be on the Wraysbury, right side of the river. The One on The River Triathlon 2023: the navigation channel will be on the Remenham, Berkshire side of the river. Halfpenny Bridge repairs 2023: temporary restrictions to access will be in place under and over the bridge arches. Tuesday 5 September to 1 November 2023 8am to 5pm Teddington Lock Cut Footbridge Repairs 2023: marker buoys will be in place to mark the navigation restriction. Monday 4 September to Friday 17 November 2023 ![]() River restrictions: updated 27 September 2023 When Please see notice for information on how to register interest in emergency access. Chertsey Lock will open between 9am and 6pm on 5 October 2023 and 6 October 2023 for emergency access only. River closures: updated 26 September 2023 WhenĦpm Sunday 24 September 2023 until further noticeĬhertsey Lock breakdown 2023: the lock is closed so that contractors can undertake repairs. Please use caution when entering and exiting the lock. Width of the tail gates is restricted to no more than 5.5 metres (18’). Gates on the pedestal side do not open fully. Please be cautious of falling debris if navigating near the bridge. ![]() ![]() Boaters are advised not to navigate up Clifton weir stream.Ī vehicle has damaged Canal Bridge, where Radcot Road A4095 crosses the River Thames. Shoal reported downstream of The Plough public house. Navigation issues: updated 4 October 2023 When Before boating on the River Thames, you should check the current river conditions.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |